Completed [Completed]
100% complete, updated on Thu 12/9/21 3:42 PM by Dean Phetterplace
Changed Status from In Process to Completed. Changed Health from Yellow to None. Changed Percent Complete from 94% to 100%. New switches have been installed and are now in production. Data center is running on a mix of old and new equipment but all new purchases will be made with the intention of running on the new network infrastructure. As systems are made available for updates or upgrades, we will move them to newer connections on the Cisco Nexus switches.
Data Center switches and top of rack equipment replacement. Redesign data center network and infrastructure.